DUOYUAN EQUIPMENT | Guangdong New Energy Factory Welding Line EPC Upgrade Project

DUOYUAN2 min read
DUOYUAN EQUIPMENT | Guangdong New Energy Factory Welding Line EPC Upgrade Project

This welding line was developed primarily for a new energy plant upgrade project in Guangdong, China, aiming to improve production capacity and efficiency. The project encompassed a comprehensive upgrade of welding fixtures, conveying equipment, hoists, and auxiliary equipment. DUOYUAN was responsible for the design, manufacture, transportation, installation, commissioning, and related technical support of the entire welding line. We are committed to providing clients with a one-stop solution to ensure smooth project implementation and efficient operation.

289268f1f8cfa2385c1d00 00 1820250725 143803

Project Overview

The body assembly line includes the following main systems and equipment: line roller bed + skid conveying system, welding fixtures, welding equipment, steel structure, secondary power, and hanging system. The entire production line is planned and designed according to the rhythm of 4JPH, with a total of 10 workstations (including 1 reserved station), covering key stations such as laser engraving, side panel assembly, laser welding room, body conveying, low-station welding, and high-station welding.

In-depth analysis of key technology modules

Sliding assembly system (MB020/MB040 station)

Technical elementsRealize value
Y-axis servo sliding mechanismSide panel assembly accuracy ±0.15mm (3 times higher than traditional methods)
Hydraulic locking positioning baseTorsional rigidity ≥8000N/mm², eliminating splicing deviation
Puppet welding pre-positioning systemDoor opening welding auxiliary time is compressed to 3 seconds
289268f1f8cfa2385c1d00 00 0220250725 143756
DUOYUAN equipment factory welding line

Intelligent Logistics Hub

Conveyor System: Roller bed + skid for full coverage Main assembly station: Lifting roller bed (load capacity ≥ 2.5 tons) Other stations: Fixed roller bed (speed 0.8 m/s) Empty skid cycle: Hoist transfer + trolley unloading → 36-second ultra-fast turnover

Project Value

More than just production line delivery

  • ✅ Growing smart manufacturing genes (reserved interfaces/load margin)
  • ✅ Quantifiable efficiency revolution (36 seconds/workstation × 99.4% pass rate)
  • ✅ Replicable upgrade paradigm (from new energy welding to full-scale smart manufacturing)
eab19e34dac8c8f8e14b00 00 0520250725 143718
289268f1f8cfa2385c1d00 00 2920250725 143654

Through this project, DUOYUAN provided the Guangdong New Energy Factory with an efficient and stable welding production line, helping them increase production capacity and optimize costs. We will continue to uphold the principle of high-quality and efficient service, promote the development of intelligent manufacturing technology, and create greater value for our customers.

Continue exploringBack to project cases

Planning a similar project?

Start with your production requirements.

Share your vehicle type, process and site constraints with our team.

Start a projectExplore our solutions

FAQ

What is the goal of the Guangdong welding-line upgrade?

The upgrade aims to improve production capacity and efficiency at a new energy plant.

Which equipment areas did the Guangdong project upgrade?

The project upgraded welding fixtures, conveying equipment, hoists, and related line equipment.