Skip to content
Foton heavy truck EMS conveyor line

Validate the factory before installation

Factory layout planning

Bring process plans, equipment positions, people and material movement into one factory layout. Use simulation to examine the line before physical installation.

DUOYUAN / Engineering & integrationAutomotive production systems

Will the planned layout work on the factory floor?

From floor plan to a validated production flow.

Explore the connected disciplines within this solution, then use the project below to see a specific application.

01

Map the process

Connect manufacturing process plans with station layouts, equipment and tooling requirements.

02

Test the movement

Simulate robots, tools, material handling and personnel at station, line or plant level.

03

Refine the layout

Examine automation locations, ergonomics and material delivery before committing to the physical arrangement.

04

Check control logic

Use virtual commissioning, including HiL or SiL simulation, to examine control and mechanical-electrical interfaces.

From capability to application

Inside a relevant project.

New energy vehicle assembly line projectProject experience

Factory layout planning

Reworking an existing line for new-energy vehicle assembly.

This upgrade project describes an optimized layout and a 12-station interior-trim automated guided vehicle (AGV) line. It shows how layout planning and equipment decisions meet within one upgrade scope.

  • Existing-line upgrade
  • Layout optimization
  • 12-station interior-trim automated guided vehicle (AGV) line
Read the project

Go deeper

Explore the technical scope.

Read the detailed service description, then discuss the configuration and interfaces for your own production line.

Define the next step

Bring your production requirements into focus.

Start with the information you have. These details help frame a useful engineering conversation.

Prepare your project brief

A floor plan with columns, entrances, utilities, clear heights and areas that must remain operational.

FAQ

What can be evaluated through factory layout simulation?

Simulation can evaluate robots, tools, material handling equipment and personnel at workstation, line or plant level to help optimize equipment placement, ergonomics and material delivery.

How does virtual commissioning help validate a production line?

Virtual commissioning uses real control systems and digital twins to test control logic and the interfaces between mechanical and electrical engineering before production begins.